Heavy equipment held a gate in place at the Goodrich Mill Pond dam last week. After a floating log hit the gate, the water level was lowered until the gate could be reinstalled. Expect water levels to lower again this week, when village officials expect a state-required bridge inspection to be conducted.
Share on Facebook
Follow on Facebook
Add to Google+
Connect on Linked in
Subscribe by Email
Print This Post